Product range required by GCC certification and GCC charging standard
Remind China to export products to the Gulf countries, pay attention to the GCC certification:
Scope: Gulf Cooperation Council (GCC) member countries: UAE, Saudi Arabia, Kuwait, Bahrain, Oman, Qatar, Yemen.
1. Products required by GCC:
|
產(chǎn)品類別 |
海關(guān)編碼 |
|
家用風(fēng)扇 |
84 14 51 00 - 84 14 59 00 |
|
冰箱,以及各種冷藏設(shè)備 |
84 18 10 00 -84 18 21 00- 84 18 29 00- 84 18 30 00- 84 18 40 00 |
|
離心式干衣機,洗衣設(shè)備,干衣設(shè)備 |
84 21 12 00 -84 50 11 00- 84 50 12 00-84 50 1900 |
|
食品研磨機及攪拌機,水果或蔬菜的榨汁機 |
85 09 40 00 |
|
烤面包片機 |
85 16 72 00 |
|
電熱美發(fā)器具,手烘干機 |
85 16 31 00 - 85 16 32 00 - 85 16 33 00 |
|
家用電加熱裝置 |
85 16 29 10 |
|
微波爐 |
85 16 50 00 |
|
其他爐,炊具烹飪板、加熱環(huán)、烤架、烤爐 |
85 16 60 00 |
|
電瞬時或儲存熱水器和浸入式加熱器 |
85 16 10 00 |
|
電熨斗 |
85 16 40 00 |
|
空調(diào)設(shè)備 |
84 15 10 00 |
|
插頭、插座、適配器、線擴展集和充電器 |
85 44 42 20 - 85 36 69 10 |
|
各種汽車機動車整車、配件 |
2. GCC certification mode:
Acceptance stage
1. Application for GC Mark Certification
2. A copy of the business license of the applicant, manufacturer, and production plant
3. Trademark registration certificate or trademark authorization letter
4. In case of inconsistency between the manufacturer and the production plant, provide a contracted processing agreement signed/stamped by both parties
5. Product Risk Analysis Form
6. English & Arabic manual
Formal experimental stage
1. Product description, key parts list
2. A description of the conformity assessment procedure followed by the manufacturer (e.g. system certification or quality manual obtained by the enterprise, etc.)
3. Design and manufacturing drawings of the product (with a brief description if necessary)
4. Product technical specifications
5. Product Instruction Manual
6. Other required documents
3. GCC certification fees:
1. Safety report fee (or CB certification): ranging from 4500-15000
2. EMC reporting fee: ranging from 2000-6000
3. Certificate fee: 5000-10000
4. Annuity: ranging from 1000-4000
4. GCC certification cycle
Test 20-26 working days, forensics, about 10 working days.




